North Wales Rail Line Revival Plan Unveiled After Decades

North Wales Rail Line Revival Plan Unveiled After Decades

A study proposes reopening the Gwynedd rail line connecting Bangor and Afon Wen, closed in the 1960s. The large project will cost billions! North Wales Rail Line Revival Plan Unveiled After Decades A study looked at reopening a Gwynedd rail line. It connects Bangor and Afon Wen. They closed it in the 1960s. The study…

Wales Express Coach Service Closer: Faster Than Trains, Fewer Stops

Wales Express Coach Service Closer: Faster Than Trains, Fewer Stops

New express coach aims to slash travel time between North and South Wales with fewer stops and affordable fares. Wales Express Coach Service Closer: Faster Than Trains, Fewer Stops Wales might soon have a new north-south coach service. This express service will have just nine stops and eight coaches a day will run between Bangor…

Residents Frustrated With New Rail Structures Blocking Garden Views

Residents Frustrated With New Rail Structures Blocking Garden Views

Residents in Cyncoed are angry about unsightly metal structures erected for rail electrification work. Residents Frustrated With New Rail Structures Blocking Garden Views People near the tracks aren’t happy. New metal structures block their garden views. Transport for Wales (TfW) is doing this work, electrifying lines to Cardiff as part of the South Wales Metro…